Question 1 · Broker Compliance · CBP’s October 2021 exam, question 73
How long does the broker have to retransmit an entry rejected by CBP for an antidumping and/or countervailing duty issue?
- Within 2 working days from the date of rejection
- Within 10 calendar days from the date of rejection
- Within 10 working days from the date of rejection
- Within 30 calendar days from the date of rejection
- Within 30 working days from the date of rejection
Show the answer
Answer: A. Within 2 working days from the date of rejection
BRPD section 1.14 says a rejected entry summary must go back to CBP within two working days from the date of rejection. One rejected before the 10th day keeps the rest of the 10-working-day deadline, but never less than two. Its only AD/CVD exception lengthens CBP's own rejection period from 90 to 300 days. That exception gives the filer no extra time. Option C is the trap: section 1.14 gives no AD/CVD filer 10 working days from rejection.
Re-keyed: CBP keyed 10 working days from an older BRPD chapter; BRPD v12.0 section 1.14 gives two working days for every rejected entry summary, AD/CVD included.
Where to find it: Open the ACE BRPD v12 to Chapter 1, section 1.14 Entry Summary Rejections, after the review notification in section 1.13. The AD/CVD exception is printed at the end of the same section. At the desk: a rejected AD/CVD summary still goes back within 2 working days, so fix the case number the same day.
From the source“Rejected entry summaries must be returned to CBP with any additional payment (if applicable) within two working days from the date of rejection ‖ Exception: AD/CVD, the time period for rejecting AD/CVD entry summaries has extended from 90 days to 300 days with supervisory approval.”
Source: ACE BRPD v12 ch. 1